Shops and small offices
Entry-level commercial solar, often around 25 kWp, sized to cover daytime loads, with a smart inverter and remote monitoring.
Commercial solar
Three-phase hybrid solar and battery systems for offices, shops, warehouses and institutions, designed from your own CEB bills and documented in writing before any work starts.
For a business, solar is a purchase decision with a roof, a budget and a power supply at stake. So we start with your bills and your building, we put the scope, the price, the warranties and the payment stages in writing, and we are clear about what is included and what is not.
Who it is for
The sizes below are typical starting points. Your own system is designed from your bills, your roof and your goals.
Entry-level commercial solar, often around 25 kWp, sized to cover daytime loads, with a smart inverter and remote monitoring.
Balanced systems, often around 50 kWp, with a battery-ready design and monitoring for performance and uptime.
Higher-output systems, often around 100 kWp, with an optimised layout for heavy daytime loads.
One standard way of working across several buildings, so each site is documented and delivered the same way.
Larger projects, such as ground-mounted plants, are covered on our solar farms page.
What we install
Commercial buildings normally run on three phases, so our commercial systems use Deye three-phase inverters from 20 kW to 100 kW, with Enovra lithium batteries where storage is part of the design.
Example from our recent proposals Two recent projects for businesses with a three-phase supply are about this size.
An example, not a quotation. Every commercial system is designed from your own CEB bills, roof and goals, and can be built to grow: more panels or batteries can be added later, subject to technical compatibility and the roof space available.
What you get in writing
Our proposals and our Sales and Installation Agreement are built so a finance director or an engineer can check them line by line.
The agreement lists each workstream as included or not included, with limits. Nothing is left to be assumed.
Panels, inverter and batteries are listed with quantities and ratings, and the warranty on each product states who provides it.
A payment schedule is agreed up front. Any change to scope, price or programme must be agreed in writing.
Our commercial systems are set to zero export, so they do not go through CEB's export schemes. If you later want to export, we tell you plainly what that needs. CEB decides approval and timing, and we cannot guarantee its dates.
How a commercial project runs
We visit, check the roof, the structure and the electrical installation, and review your CEB bills and daily use.
You receive the system design, the equipment list, warranties, price, payment schedule and the assumptions behind every estimate.
You sign the agreement. Any financing paperwork is handled with your lender before equipment is ordered. If you have chosen to export, we also prepare the CEB application.
Work is planned around your operations, for example outside busy hours. We then test, commission, set up monitoring and train your team.
On site
This is the way we plan every commercial installation. Your own method statement, programme and checks are written for your building before work starts.
This is an estimate for equipment that is ordered in, counted from the signed agreement and deposit. It is not a guaranteed date. If you later choose to export to the grid, CEB's own process comes on top and is not included in these dates.
A commercial building stays in use while we work. Each project gets a written method statement and risk assessment before anyone goes on the roof, and anyone on site may stop work if it is not safe.
Edge protection and full-body harnesses. Nobody works alone at height, and work stops in rain, high wind or storms.
A certified boom-lift operator with a banksman guiding the lift, and panels carried by the frame in controlled batches.
Licensed electricians, insulated tools, and a lock-off and test-dead procedure before any circuit is touched.
Exclusion zones, drop-zone lines, tethered tools, barriers and signs, and quiet, tidy working. Disruptive tasks are scheduled with you, for example on a Saturday.
Correct connectors and torque, the battery handled to the manufacturer's rules, and extinguishers at the roof access and the plant area.
Stand-down rules, materials secured at the end of every shift, and equipment secured or removed on a cyclone warning.
Recent commercial work
Client names are kept private unless the client has agreed to be named.
Awarded to Enovra, project under way
Installation is planned for a Saturday, so the business keeps running normally and visitors are not disturbed.
Awarded to Enovra, project under way
Supplied and installed as one package: mounting structure, wiring and protection, installation, and engineering testing, commissioning and sign-off.
Registered and approved
Ask us for the certificate details when you prepare a tender or a due-diligence file.
Straight talk
Usually not in the price
These items are excluded unless your agreement expressly includes them, so you can budget for them early:
Financing
Many businesses finance solar through a bank or a development lender. Financing is an agreement between you and the lender, who decides on approval. We supply the quotation and technical documents lenders ask for.
Questions from businesses
A business system is sized from your real load profile and CEB bills, which are often higher and concentrated in working hours. The connection may be three-phase, the roof or structure needs a closer engineering check, and larger systems that export can need their own CEB studies and approvals. We cover these points in the written proposal so nothing is left to assumption.
Many offices, shops, warehouses and factories in Mauritius take their supply on three phases. A three-phase inverter feeds all three, so solar and battery power reaches your whole installation rather than a single phase. We use Deye three-phase inverters from 20 kW to 100 kW, and we check your supply and the CEB connection rules before we size anything.
Commercial systems use Deye three-phase inverters, from 20 kW to 100 kW, with Enovra lithium (LiFePO4) batteries. Before the battery is connected, its model, communication method and voltage range are confirmed in writing with the manufacturers, and the pairing is checked again on site and at commissioning. Your proposal lists the exact models and the warranty on each product, and says who provides it.
Often, yes. We can design a starter system with room to grow, for example an inverter with headroom for more panels and a battery that can be extended. Adding capacity later depends on technical compatibility, the roof space available, so we say what is realistic at the proposal stage.
As a guide, about three months from the signed agreement and deposit when the equipment is ordered in: roughly a month for survey, engineering, permits to work and ordering, a month for shipping and delivery, and a month for installation, testing and handover. These are estimates, not guaranteed dates. If you choose to export, CEB's own process comes on top.
Each project has a written method statement and risk assessment before work starts. On site that means edge protection and full-body harnesses for work at height, a certified boom-lift operator with a banksman, licensed electricians using lock-off and test-dead procedures, exclusion zones and signs, and stand-down rules for rain, strong wind and cyclone warnings. The key checks are signed off before work continues, and the system is tested before it is switched on.
Only the circuits we agree with you as backup loads, and only if backup is part of the design. Switching to or from backup can cause a brief interruption, so keep your own UPS on critical IT equipment unless we agree otherwise in writing. Battery capacity, your load and the settings decide how long backup lasts, and it is not a promise to run any particular equipment for a set time.
It lists the equipment with make and model, the quantities and ratings, what the price includes and what it does not, the warranty on each product, the payment schedule and the assumptions behind any estimate of savings. A contract is only formed when you sign our Sales and Installation Agreement, which repeats the scope, the exclusions and who is responsible for what.
Not for a system designed for self-consumption. Our commercial systems are set to zero export: they supply your own building and send nothing to the CEB grid, so they do not go through CEB's export schemes. If you want to export, that needs a separate CEB application, and the route depends on the size of the system, your connection and your tariff. CEB then decides approvals, inspections, meters and the date of activation, so we cannot guarantee them. Your proposal states which mode the system is designed for.
We agree the installation plan with you before work starts. Where it suits you, work can be scheduled outside your busiest hours, for example on a weekend, and we keep access and noise in mind. Dates are estimates because they also depend on stock, shipping, weather and site access.
Often, yes, through a bank or a development lender, subject to the lender's own approval. Financing is an agreement between you and the lender. Enovra is not the lender, but we can supply the technical documents and quotation that lenders ask for. A delay in a loan does not postpone a payment stage that has already been reached under the agreement.
We test and commission the system, set up monitoring, and hand over with training for your team. After-sales support is handled by our local team, and your proposal states the warranty on each product and who provides it.
Send your latest CEB bills and a few photos of the roof. We will tell you what is realistic and what to check first.