Commercial solar

Commercial solar for Mauritian businesses

Three-phase hybrid solar and battery systems for offices, shops, warehouses and institutions, designed from your own CEB bills and documented in writing before any work starts.

For a business, solar is a purchase decision with a roof, a budget and a power supply at stake. So we start with your bills and your building, we put the scope, the price, the warranties and the payment stages in writing, and we are clear about what is included and what is not.

Request a commercial assessment WhatsApp us

Who it is for

Systems sized to how your business uses power

The sizes below are typical starting points. Your own system is designed from your bills, your roof and your goals.

Shops and small offices

Entry-level commercial solar, often around 25 kWp, sized to cover daytime loads, with a smart inverter and remote monitoring.

Offices and showrooms

Balanced systems, often around 50 kWp, with a battery-ready design and monitoring for performance and uptime.

Warehouses and factories

Higher-output systems, often around 100 kWp, with an optimised layout for heavy daytime loads.

Chains and multi-site groups

One standard way of working across several buildings, so each site is documented and delivered the same way.

Larger projects, such as ground-mounted plants, are covered on our solar farms page.

What we install

Three-phase hybrid systems: Deye inverters and Enovra batteries

Commercial buildings normally run on three phases, so our commercial systems use Deye three-phase inverters from 20 kW to 100 kW, with Enovra lithium batteries where storage is part of the design.

Solar panels Three-phase hybrid inverter Deye, 20 to 100 kW Enovra lithium battery Your building three-phase supply CEB grid supplies you when needed DC AC no export
How the parts connect. Drawn by Enovra to explain the layout; every site has its own design.

What goes into a commercial system

  • High-power solar panels Laid out for your roof, flat or sloped, in rows wired straight to the inverter.
  • Three-phase Deye inverters, 20 kW to 100 kW Commercial buildings normally run on three phases. The inverter feeds all three and manages solar, battery and grid together.
  • Enovra lithium batteries Rack-mounted lithium (LiFePO4) storage, supplied by Enovra. It keeps midday solar for later use and, where the design includes backup, can supply the circuits agreed with you in a power cut.
  • Protection, mounting and monitoring A mounting structure chosen for your roof and for Mauritius's marine climate, DC and AC isolation, surge protection, earthing and bonding, labelled cabling and remote monitoring.
  • Self-consumption, no export Our commercial systems are set to zero export: solar and battery power your own building first and nothing is sent to the CEB grid, so they do not go through CEB's export schemes. If you later want to export, that is a separate CEB application, subject to CEB's approval.

Example from our recent proposals Two recent projects for businesses with a three-phase supply are about this size.

About 60 panelsAbout 35 kWp, roof-adapted mounting
50 kW inverterDeye three-phase hybrid
About 30 kWhEnovra lithium battery storage

An example, not a quotation. Every commercial system is designed from your own CEB bills, roof and goals, and can be built to grow: more panels or batteries can be added later, subject to technical compatibility and the roof space available.

What you get in writing

Clear commitments before you sign anything

Our proposals and our Sales and Installation Agreement are built so a finance director or an engineer can check them line by line.

Scope, and what is not included

The agreement lists each workstream as included or not included, with limits. Nothing is left to be assumed.

Equipment by make and model

Panels, inverter and batteries are listed with quantities and ratings, and the warranty on each product states who provides it.

Payment tied to stages

A payment schedule is agreed up front. Any change to scope, price or programme must be agreed in writing.

Self-consumption, no export

Our commercial systems are set to zero export, so they do not go through CEB's export schemes. If you later want to export, we tell you plainly what that needs. CEB decides approval and timing, and we cannot guarantee its dates.

How a commercial project runs

Four stages, each with a clear output

  1. Assessment and bills

    We visit, check the roof, the structure and the electrical installation, and review your CEB bills and daily use.

  2. Design and proposal

    You receive the system design, the equipment list, warranties, price, payment schedule and the assumptions behind every estimate.

  3. Agreement and ordering

    You sign the agreement. Any financing paperwork is handled with your lender before equipment is ordered. If you have chosen to export, we also prepare the CEB application.

  4. Installation and handover

    Work is planned around your operations, for example outside busy hours. We then test, commission, set up monitoring and train your team.

Start with an assessment

On site

How the installation is done, checked and handed over

This is the way we plan every commercial installation. Your own method statement, programme and checks are written for your building before work starts.

A typical programme: about three months

  1. Month 1Survey, engineering and orderingSite survey, engineering review, permits to work and lift booking, while the equipment is produced and sourced.
  2. Month 2Shipping and deliveryShipping, customs and delivery to site. Some preparation work, such as the mounting structure and cable route, can start before the equipment arrives.
  3. Month 3Installation and handoverPanels, cabling, inverter and battery, then testing, commissioning, training and handover.

This is an estimate for equipment that is ordered in, counted from the signed agreement and deposit. It is not a guaranteed date. If you later choose to export to the grid, CEB's own process comes on top and is not included in these dates.

Professional installation, with all the safety gear and kits

A commercial building stays in use while we work. Each project gets a written method statement and risk assessment before anyone goes on the roof, and anyone on site may stop work if it is not safe.

Working at height

Edge protection and full-body harnesses. Nobody works alone at height, and work stops in rain, high wind or storms.

Lifting and handling

A certified boom-lift operator with a banksman guiding the lift, and panels carried by the frame in controlled batches.

Electrical safety

Licensed electricians, insulated tools, and a lock-off and test-dead procedure before any circuit is touched.

Your site and your neighbours

Exclusion zones, drop-zone lines, tethered tools, barriers and signs, and quiet, tidy working. Disruptive tasks are scheduled with you, for example on a Saturday.

Fire and battery safety

Correct connectors and torque, the battery handled to the manufacturer's rules, and extinguishers at the roof access and the plant area.

Weather and cyclones

Stand-down rules, materials secured at the end of every shift, and equipment secured or removed on a cyclone warning.

Checked before it is switched on

  • A qualified Responsible Engineer reviews the design and signs the key checks. Work does not continue past a sign-off check until it is signed.
  • The earthing of the structure is checked before the panels are fitted, and the cable containment is inspected before any cable is terminated.
  • The battery stays disconnected until the tests pass. The battery and the inverter are confirmed in writing with the manufacturers to work together, then checked again on site and at commissioning.
  • Tests with IEC 62446-1, the reference standard for grid-connected solar, include polarity, string voltage and current, insulation resistance, earth loop impedance, RCD and phase sequence. Results go on the commissioning report.

What you receive at handover

  • As-built drawings and the single-line diagram
  • The test and commissioning report
  • Datasheets, manuals and serial numbers, and the warranty documents stated in your agreement
  • Operation, cleaning and emergency shutdown instructions, and training for your team
  • A snagging list, so any small items are recorded and corrected

What we need from you

  • Access to the roof and the plant area on the agreed dates
  • Roof drawings and any structural or waterproofing information you hold
  • Information on your electrical installation, your supply, any UPS and your essential loads
  • Agreed times for any power interruption, so sensitive equipment is switched over with a written sequence

Good to know before you decide

  • These systems are set to zero export. If you later want to export to the grid, that needs a separate CEB application, and may mean changes to settings, metering or equipment under a separate quotation.
  • The structural condition and capacity of the roof stay with the building owner. Our engineer advises whether a structural assessment is needed, and roof strengthening is not included unless the agreement says so.
  • Switching to or from backup power can cause a brief interruption. Keep your own UPS on critical IT equipment unless we agree otherwise in writing.

Recent commercial work

Projects and proposals for businesses

Client names are kept private unless the client has agreed to be named.

Awarded to Enovra, project under way

Office-based business

Location
Port Louis
System
Three-phase hybrid solar with battery storage: 60 panels, a 50 kW Deye inverter and about 30 kWh of Enovra battery

Installation is planned for a Saturday, so the business keeps running normally and visitors are not disturbed.

Awarded to Enovra, project under way

Design company

Location
Poste de Flacq
System
Three-phase hybrid solar with battery storage: 62 panels (about 36 kWp), a 50 kW Deye inverter and 30 kWh of Enovra battery

Supplied and installed as one package: mounting structure, wiring and protection, installation, and engineering testing, commissioning and sign-off.

See our installations map →

Registered and approved

Credentials you can check

Ask us for the certificate details when you prepare a tender or a due-diligence file.

Straight talk

What we do not promise

  • Savings, solar output and payback are estimates, not guarantees. Weather, shading, your use and CEB tariffs all affect them.
  • If you choose to export, CEB decides approval, inspection, meters and the date of activation. We prepare and follow up, but we cannot guarantee its timing.
  • Installation dates are estimates. They depend on stock, shipping, weather and site access.

Usually not in the price

Standard exclusions, unless written in

These items are excluded unless your agreement expressly includes them, so you can budget for them early:

  • Structural engineering, and roof repair or replacement
  • Major rewiring, trenching and other civil works
  • Cranes, scaffolding or specialist access
  • If you choose to export: CEB fees, meters, transformers and network reinforcement

Financing

Spread the cost with your lender

Many businesses finance solar through a bank or a development lender. Financing is an agreement between you and the lender, who decides on approval. We supply the quotation and technical documents lenders ask for.

Ask us about financing →

Questions from businesses

Commercial solar, answered plainly

How is commercial solar different from solar for a home?

A business system is sized from your real load profile and CEB bills, which are often higher and concentrated in working hours. The connection may be three-phase, the roof or structure needs a closer engineering check, and larger systems that export can need their own CEB studies and approvals. We cover these points in the written proposal so nothing is left to assumption.

Why are commercial systems three-phase?

Many offices, shops, warehouses and factories in Mauritius take their supply on three phases. A three-phase inverter feeds all three, so solar and battery power reaches your whole installation rather than a single phase. We use Deye three-phase inverters from 20 kW to 100 kW, and we check your supply and the CEB connection rules before we size anything.

Which inverters and batteries do you use for businesses?

Commercial systems use Deye three-phase inverters, from 20 kW to 100 kW, with Enovra lithium (LiFePO4) batteries. Before the battery is connected, its model, communication method and voltage range are confirmed in writing with the manufacturers, and the pairing is checked again on site and at commissioning. Your proposal lists the exact models and the warranty on each product, and says who provides it.

Can we start small and add panels or batteries later?

Often, yes. We can design a starter system with room to grow, for example an inverter with headroom for more panels and a battery that can be extended. Adding capacity later depends on technical compatibility, the roof space available, so we say what is realistic at the proposal stage.

How long does a commercial installation take?

As a guide, about three months from the signed agreement and deposit when the equipment is ordered in: roughly a month for survey, engineering, permits to work and ordering, a month for shipping and delivery, and a month for installation, testing and handover. These are estimates, not guaranteed dates. If you choose to export, CEB's own process comes on top.

How do you keep the work safe on an occupied building?

Each project has a written method statement and risk assessment before work starts. On site that means edge protection and full-body harnesses for work at height, a certified boom-lift operator with a banksman, licensed electricians using lock-off and test-dead procedures, exclusion zones and signs, and stand-down rules for rain, strong wind and cyclone warnings. The key checks are signed off before work continues, and the system is tested before it is switched on.

Will the battery keep my business running in a power cut?

Only the circuits we agree with you as backup loads, and only if backup is part of the design. Switching to or from backup can cause a brief interruption, so keep your own UPS on critical IT equipment unless we agree otherwise in writing. Battery capacity, your load and the settings decide how long backup lasts, and it is not a promise to run any particular equipment for a set time.

What does a commercial proposal from Enovra contain?

It lists the equipment with make and model, the quantities and ratings, what the price includes and what it does not, the warranty on each product, the payment schedule and the assumptions behind any estimate of savings. A contract is only formed when you sign our Sales and Installation Agreement, which repeats the scope, the exclusions and who is responsible for what.

Does my business need CEB approval for a solar system?

Not for a system designed for self-consumption. Our commercial systems are set to zero export: they supply your own building and send nothing to the CEB grid, so they do not go through CEB's export schemes. If you want to export, that needs a separate CEB application, and the route depends on the size of the system, your connection and your tariff. CEB then decides approvals, inspections, meters and the date of activation, so we cannot guarantee them. Your proposal states which mode the system is designed for.

How do you limit disruption to my business?

We agree the installation plan with you before work starts. Where it suits you, work can be scheduled outside your busiest hours, for example on a weekend, and we keep access and noise in mind. Dates are estimates because they also depend on stock, shipping, weather and site access.

Can a business finance a solar system?

Often, yes, through a bank or a development lender, subject to the lender's own approval. Financing is an agreement between you and the lender. Enovra is not the lender, but we can supply the technical documents and quotation that lenders ask for. A delay in a loan does not postpone a payment stage that has already been reached under the agreement.

What happens after installation?

We test and commission the system, set up monitoring, and hand over with training for your team. After-sales support is handled by our local team, and your proposal states the warranty on each product and who provides it.

More questions and answers →

Talk to us about your building

Send your latest CEB bills and a few photos of the roof. We will tell you what is realistic and what to check first.